Speedy Grant of License by PSQCA

  Reduction in Time for Obtaining Certification Marks License Reform Description Time for Getting Licensee from PSQCA Reduced Substantially Before: PSQCA was allowed 45 days to issue a C.M license, causing delay and extra cost. After:  A m aximum period of 28 days is fixed to grant a license. Sector Manufacturing (Food Products, Light Engineering,…

NOC requirement of EPA for low-risk buildings eliminated

    Eliminate NOC Requirement of EPA for Buildings of Non-Hazardous Category Sector Construction Sector, Industrial Premises (Manufacturing Sector) Beneficiaries SMEs Jurisdiction/Location Khyber Pakhtunkhwa Department KP Environment Protection Agency Date of Implementation 26-06-2021 Timeline Last 3 months  Details  Difficulty ●      All businesses constructing buildings in KP had to obtain NOC from Environment Protection Agency which…